370x Filetype PDF File size 1.06 MB Source: www.ijert.org
International Journal of Engineering Research & Technology (IJERT)
ISSN: 2278-0181
Vol. 3 Issue 5, May - 2014
Analysis of Lean Construction by Using Last
Planner System
S M Abdul Mannan Hussain1 Dr. T. Seshadri Sekhar2 Asra Fatima3
Research Scholar, GITAM University,Hyd Project Guide, Professor & HOD Research Scholar, GITAM University
Assistant Professor ,Dept. of Civil Engg GITAM University, Hyderabad campus Assistant Professor, Civil Eng. Dept
Malla Reddy Engineering College Department of Civil Engineering Muffakham Jah Engineering College
Secundrabad. Banjara Hills, Hyderabad
Abstract — Lean construction is a relatively new construction Planning is not conceived as a system, but is rather
management philosophy which has evolved from Lean understood in terms of the skills and talents of the
manufacturing principles. Lean construction along with its individuals who are in charge of planning.
various tools like the Pull Approach, Just in Time, Total Quality One of the best known Lean techniques is the Last
Management, Continuous Improvement, Last Planner System, Planner System which has been demonstrated to be a
etc. has gathered a lot of momentum in the developed nations. very useful tool for the management of the construction
The challenge now lies in implementing it in the developing process, and continuous monitoring of the planning
countries. The Last Planner system is a production planning efficiency.
system designed to produce predictable work flow and rapid
learning in programming, design, construction and commission The Last Planner integrated components are master plan,
of projects The essence of Lean Construction is to increase in phase planning, look- ahead and weekly planning.
efficiency by elimination of non value adding activities.
Keywords—Master schedule, Look-ahead schedule, Weekly 3. THE RESOURCE-CONSTRAINED SCHEDULING
workplan,Percent planned complete, Make work ready planning. PROBLEM
Planning is the construction of the project/process model and
1. INTRODUCTION definition of constraints/objectives. Scheduling refers to the
assignment of resources to activities (or activities to resources)
The objective of the present study is to analyze the Last at specific points in, or durations of, time. The definition of
Planner System in reducing the construction complexities the problem is thus primarily a planning issue, whereas the
involved in the project and to analyze the last planner system execution of the plan is a scheduling issue. Yet planning and
to complete the project within the stipulated time and cost and scheduling are coupled; the performance of the scheduling
to study the concept of lean construction and how it is being algorithm depends on the problem formulation, and the
implied in the local construction industry Lean construction problem formulation may benefit from information obtained
project is very different compared to traditional construction during scheduling
project management where Lean approach aims to maximize
performance for the customer at the project level, set well- 4. GENERAL FORMULATION
defined objective clearly for delivery process, design In its most general form, the resource-constrained scheduling
concurrent product and process and applies production control problem is defined as follows:
throughout the life of project. Generally, lean approach breaks
the construction project to smaller parts of activities which Set of activities that must be executed
will be defined clearly the start and end date for completion of A set of resources with which to perform the
each activity with an appointed person to keep on monitoring activities
the all the activities to be completed according schedule. Set of constraints which must be satisfied, and
A set of objectives with which to judge a schedule’s
2. NECESSITY OF THE STUDY
performance.
Planning defining criteria for success and producing strategies Minimization of project duration
for achieving objectives. Control causing events to conform to Minimization of cost
plan and promoting, learning and re-planning. Better planning Maximization of the net present value of the project
results from overcoming several obstacles common in the Optimum resource utilization efficiency
construction industry, including Involvement of designers in joint solutions.
Management focus is on control, which prevents bad Direct interactions between designers and customers.
changes and neglects breakthrough, which causes good Explicit and healthy client supplier relations.
changes. Always working with a set of design alternatives
IJERTV3IS051307 www.ijert.org 1059
International Journal of Engineering Research & Technology (IJERT)
ISSN: 2278-0181
Vol. 3 Issue 5, May - 2014
5. IMPLEMENTATION OF LAST PLANNER SYSTEM 6.1 Application of lean construction principles to
This tool in simple words can be taken to be an assimilation of design management
the above mentioned tools. It also has a number of other Having some degree of flexibility in the sequence of
features which are explained below. The main objectives of a design activities. Not defining activities in a very
production control system like the Last Planner System are as fine level of detail and encouraging team work.
follows Involvement of designers in joint solutions.
Manage and mitigate the variability. Direct interactions between designers and
Assignments and schedules should be sound regarding customers.
their prerequisites. Explicit and healthy client supplier relations.
The completed assignments should be monitored. Always working with a set of design alternatives.
Causes for failure to complete the planned work should By making use of the integrated models, the share of wasteful
be investigated and removed. activities can be reduced, output value can be increased by
The prerequisites of upcoming assignments should be more emphasis on customer’s requirement, and variability can
made ready. be reduced by reducing the number of steps involved in the
The traditional push based construction process model design process; cycle times and most importantly continuous
should be incorporated with pull techniques. improvement can be built into the process.
Traditional project control focuses on hierarchical 6.1.1. Application of lean construction principles in
decision making and thus the decision making process construction planning
lies in the hands of few and often decision makers are They have highlighted the fact that the construction planning
unaware of the ground realities. Decision making powers process most prevalent today is that of developing a single
should be well distributed among the project team. plan and adhering to it for the entire duration. Those plans are
seldom reviewed during the execution stage and the corrective
actions only include adjusting the original schedules to actual
performance. To improve the planning process they have
suggested a shift towards contingency planning which
includes preparation of several detailed plans prior to
execution for different project environments. Hence the need
to review the original plan for problems very seldom arises.
To implement the contingency planning substantial amount of
time and resources need to be expended during the
construction planning prior to the execution and also in project
control during construction work on site.
6.1.2. Application of lean construction principles in
construction execution
This stage involves utilization of the last planner tool
Figure.1 Last Planner system (described earlier) of lean construction for execution of the
In CPM there is strict adherence to the master schedule even project. In this section the meaning of the “pull process” for
when great obstacles lie in its path. Supervisors keep on building up of the schedules and the workable backlog is
pressurizing the subordinates to produce despite obstacles. described.
Many a time these obstacles result in poor quality output 6.1.3. Phase scheduling
which remain in the project supply chain throughout. Last Lean construction uses the pull technique for development of
Planner System (LPS) aims to shift the focus of control from project schedules. Thereby only those tasks are scheduled and
the workers to the flow of work that links them together. The executed whose completion releases work to other tasks. This
two main objectives of LPS are to make better assignments to way, only the work that is required is done and thereby
direct workers through continuous learning and corrective prevents any over production .The phase schedules serve as a
action and to cause the work to flow across production units in basis for the development of look-ahead schedules. In the
the best achievable sequence and rate. The Figure shows the phase scheduling process, representatives of all organizations
processes of Last planner system. involved in the phase sit down to decide on the work that must
6. APPLICATION OF LEAN CONSTRUCTION be performed to release work to other phases. The people
PRINCIPLES TO THE CONSTRUCTION PROCESS responsible for the work write their requirements on a sheet of
The application of lean construction tools to the construction paper and stick them on a wall in their expected sequence of
process will be explained in this section. The construction performance. After all sheets are on the walls, the network
process is considered as a three phase process: diagram is prepared by moving and shifting of sheets. Thus
Design new techniques and methodologies for doing the work are
Planning found out. After the finalization of the sequence of the
Scheduling activities, durations (without any float) are applied to them.
Execution The network diagram is then reexamined to look for processes
Monitoring a which can be shortened. The earliest practical start date
Controlling (calculated) for the phase is then determined by working
IJERTV3IS051307 www.ijert.org 1060
International Journal of Engineering Research & Technology (IJERT)
ISSN: 2278-0181
Vol. 3 Issue 5, May - 2014
backwards from the schedule. If there is any positive
difference between the possible and the calculated start date
that time can be allocates to critical processes in the phase to
protect them from uncertainties. In case the difference is
negative then the phase will have to be delayed and the time
lost will have to be made up in other phases.
7. Look ahead process and Last Planner System
The look ahead process involves the following processes:
explosion; screening and make ready.
7.1.1 Explosion
This involves exploding the activities mentioned in the master
schedule to great details to identify all the pre requisites for
the activity before it enters the look a-head window.
7.1.2 Screening Figure.2 Lean Construction principle
This process is used for determining the status of tasks that Planning for the project cannot be performed in detail much
are present in the look a-head window based on their pre before the events being planned. Consequently, deciding what
requisites (constraints). Here we can choose whether to and how much work is to be done by a design squad or a
advance or postpone the tasks based on their status.
construction crew is rarely a matter of simply following a
7.1.2 Make ready master schedule established at the beginning of the project.
In this process the lead time (time for order to delivery) is
estimated, the pre requisites are pulled and the work is 9. MODEL DEVELOPMENT
executed. This process requires great caution as the ordering
The following are the basic step which is involved in the
times have to be estimated reliably to prevent any inventory development of a model. The Flow chart of Last planner
from building up at site. The status of the consuming activity system is shown in the figure.
should be matched with the ordering times of resources with
great detail and caution. The make ready work then enters the
workable backlog so that the scheduled work can begin. The
work is monitored by using PPC (Percent of Planned
Complete) and the inability to achieve a high PPC is
investigated for process improvement and to prevent the
problems from re occurring.
7.1.3 Percent planned complete
PPC or Percent of planned complete is the method used for
monitoring of the project. Unlike the techniques of earned
value estimate which is traditionally used for monitoring of
projects, the PPC measurement has the following advantages:
Work is selected by the workers themselves and
hence there is less chance of time over run.
The causes for the non completion of work are
mentioned explicitly while analyzing PPC.
PPC helps in continuous improvement of the
construction project as
Efforts are made to prevent the re occurrence of
problems.
8. LEAN CONSTRUCTION PRINCIPLE
The traditional project management practices treats all the
activities in construction as value adding activities and
accordingly the construction process is a conversion based
process in which one value adding activity leads to another.
This model pressurizes the available resources to act fast
thereby resulting in a compromise in the quality of the
construction. On the other hand lean construction is a flow and
conversion based model where a construction process is a
collection of conversion processes involving flows of
information and materials from one process to the other as
depicted in Fig. (Lean Construction process)
Figure.3 Model Development of Last Planner System
IJERTV3IS051307 www.ijert.org 1061
International Journal of Engineering Research & Technology (IJERT)
ISSN: 2278-0181
Vol. 3 Issue 5, May - 2014
Figure.4 Processs of Lean Construction vs Last Planner System
IJERTV3IS051307 www.ijert.org 1062
no reviews yet
Please Login to review.