jagomart
digital resources
picture1_Agreement Form 201907 | Form Of Agreement


 129x       Filetype PDF       File size 0.08 MB       Source: mhb.com.my


Agreement Form 201907 | Form Of Agreement

icon picture PDF Filetype PDF | Posted on 10 Feb 2023 | 2 years ago
Partial capture of text on file.
            FORM OF AGREEMENT 
            SUBCONTRACT NO. .................... 
             
             
                         FORM OF AGREEMENT 
             
             
                                     Malaysia Marine And Heavy Engineering Sdn. Bhd. 
                      FORM OF AGREEMENT 
                      SUBCONTRACT NO. .................... 
                      PAGE 1 OF 3 
                       
                                                                             
                                                                             
                                                             FORM OF AGREEMENT 
                       
                      This SUBCONTRACT is made on …….…. day of …………… 2012  
                       
                      BETWEEN 
                       
                      (1)    Malaysia  Marine  And  Heavy  Engineering  Sdn.  Bhd.  (Co.  no.  14558-P)  a 
                             company incorporated in Malaysia, whose business address is at PLO 3, Jalan 
                             Pekeliling,  P.O.  BOX  77,  81700  Pasir  Gudang,  Johor,  Malaysia  (  hereinafter 
                             referred to as “MMHE”);  and 
                      (2)    [SUBCONTRACTOR name]., (Co. No ...................), a company incorporated in 
                             Malaysia, whose business address is at [SUBCONTRACTOR address] (hereinafter 
                             referred to as “SUBCONTRACTOR”). 
                       
                      WHEREAS  
                       
                      (A)    MMHE is a company principally engaged in the business of engineering, fabrication 
                             and construction relating to the oil and gas industry. 
                      (B)    MMHE requires the SUBCONTRACTOR to execute and complete the Structural 
                             works for [project name] (hereinafter called the "WORK") in conformity with the 
                             SUBCONTRACT. 
                      (C)  The SUBCONTRACTOR is able and willing to carry out the WORK in accordance 
                             with the SUBCONTRACT. 
                       
                      NOW IT IS AGREED AS FOLLOWS: 
                       
                      1.  DEFINITIONS 
                           In  this  SUBCONTRACT, word and expression shall have the same meanings as 
                           respectively assigned to them in the General Conditions of Subcontract hereinafter 
                           referred to. 
                            
                      2.  SUBCONTRACT PRICE 
                           In consideration of the execution, completion and performance of the WORK, MMHE 
                           shall hereby covenants to pay the SUBCONTRACTOR the SUBCONTRACT PRICE 
                           of Ringgit Malaysia : …………………………………only (RM.............................), the 
                           breakdown of which is as specified in Section 2 - Schedule of Compensation, at 
                           the time and in the manner prescribed in this SUBCONTRACT.  
                                                           
                       
                                                             Malaysia Marine And Heavy Engineering Sdn. Bhd. 
                  FORM OF AGREEMENT 
                  SUBCONTRACT NO. .................... 
                  PAGE 2 OF 3 
                   
                       In consideration of the payments to be made to the SUBCONTRACTOR by MMHE, 
                       the SUBCONTRACTOR hereby covenants with MMHE that the SUBCONTRACTOR 
                       will  duly  perform  the  WORK  conforming to  all respect  with  the  provisions  of  this 
                       SUBCONTRACT. 
                        
                  3.  ENTIRE AGREEMENT 
                       This SUBCONTRACT shall consist of the following listed documents: 
                           Form of Agreement 
                           Section 1 – General Conditions of Subcontract 
                           Section 2 - Schedule for Compensation 
                           Section 3 – Scope of Work 
                           Section 4 – Health, Safety and Environment 
                           Section 5 – Administration Procedures 
                           Section 6 – Specifications, Codes, Standards and Procedures 
                           Section 7 – Drawings 
                       This  SUBCONTRACT sets forth the entire  contract  and  agreement  between  the 
                       Parties  pertaining  to  the  WORK  and  supersedes  all  enquiries,  proposals, 
                       agreements, negotiations and commitments, whether written or oral, prior to the date 
                       of   execution  of  this  SUBCONTRACT,  pertaining  to  the  WORK  of  this 
                       SUBCONTRACT.  The provisions of this SUBCONTRACT may be changed only by 
                       written agreement between the parties to this SUBCONTRACT.  
                       The  aforesaid  documents  shall  be  read  and  construed  as  part  of  the 
                       SUBCONTRACT and as one document. In the event of ambiguity or inconsistency in 
                       or between the sections or documents, they shall be given precedence in the order 
                       listed above. 
                        
                  4.  TIME FOR COMPLETION 
                       SUBCONTRACTOR  shall  perform  the  WORK  strictly  in  accordance  with  the 
                       SUBCONTRACT and achieve the Completion Dates as stated in the Appendix 1 of 
                       Section1: Conditions of Subcontract.  
                   
                  5.  COMMUNICATION ADDRESSES AND FACSIMILE 
                       The addresses and facsimile numbers of the Parties set out in the Section 5 – 
                       Subcontract Administration Procedures. 
                   
                                                       
                   
                                                         Malaysia Marine And Heavy Engineering Sdn. Bhd. 
The words contained in this file might help you see if this file matches what you are looking for:

...Form of agreement subcontract no malaysia marine and heavy engineering sdn bhd page this is made on day between co p a company incorporated in whose business address at plo jalan pekeliling o box pasir gudang johor hereinafter referred to as mmhe subcontractor whereas principally engaged the fabrication construction relating oil gas industry b requires execute complete structural works for called work conformity with c able willing carry out accordance now it agreed follows definitions word expression shall have same meanings respectively assigned them general conditions price consideration execution completion performance hereby covenants pay ringgit only rm breakdown which specified section schedule compensation time manner prescribed payments be by that will duly perform conforming all respect provisions entire consist following listed documents scope health safety environment administration procedures specifications codes standards drawings sets forth contract parties pertaining su...

no reviews yet
Please Login to review.