399x Filetype XLS File size 0.09 MB Source: www.ct.gov
Project Expended -as
Town Project Name Agency Type Contractor ARRA Funds Status 8/4/10
MDC - Homestead Avenue Interceptor NE Remsco
Hartford Extension DEP Clean Water Construction $22,889,625 Underway
MDC - Tower Avenue Area - North
Hartford Sewer Separation DEP Clean Water CB Utility Company $5,769,523 Underway
Hartford MDC - Burton Street Drain Separation DEP Clean Water Baltazar $7,828,680 Underway
MDC - Granby Street Area Sewer
Hartford Separation DEP Clean Water Manafort Brothers $0 Underway
MDC - Green Infrastructure -
Hartford incinerator #3 DEP Clean Water Banton Construction $9,602,060 Underway
Port of New Haven Truck Stop City of New
New Haven Electrification DEP Diesel Haven/Laydon $380,256 Underway
portion of
Statewide Retrofit DOT Trucks DEP Diesel Cummins Power $510,000 Completed
Retrofit Transportation Construction portion of
Statewide Equipment DEP Diesel Cummins Power $510,000 Underway
Seymour Tingue Dam Bypass Channel DEP Habitat $2,500,000 In design
Underground Loureiro
Hartford Pittman Property DEP Tanks Engineering $200,000 Underway
Underground Loureiro
Mansfield Hammer Property DEP Tanks Engineering $165,000 Underway
Underground Loureiro
New Haven Pitts Chapel Property DEP Tanks Engineering $125,000 Underway
Underground Loureiro
Stratford 2350 Stratford Avenue Property DEP Tanks Engineering $300,000 Underway
Underground Loureiro
Terryville Fuller Property DEP Tanks Engineering $200,000 Underway
Underground Loureiro
Waterbury Monti Property DEP Tanks Engineering $80,000 Underway
Underground Loureiro
Waterbury Renner Property DEP Tanks Engineering $25,000 Underway
Reconstruction of Runway 15-33 @ Tilcon Connecticut,
Windsor Locks Bradley Airport DOT Aviation Inc. $7,500,000 Completed
Milton C. Beebe &
Mystic/Stonington Mystic Streetscape improvements DOT Enhancement Sons $905,760 Underway $507,160
Noroton Heights Station Blakeslee Arpaia
Darien Improvements DOT Enhancement Chapman $499,600 Underway $6,879
Summer
Stratford Housatonic River Greenway DOT Enhancement TBD $750,000 2010 $4,253
East
Hartford/Manchester I-84/I-384 Trail DOT Enhancement American Industries $766,866 Underway $9,242
Summer
Mansfield Birch Road Bikeway DOT Enhancement TBD $300,000 2010
New Fairfield Town Center Streetscape DOT Enhancement Reliable Excavating $338,000 Underway $3,922
Schultz
Torrington Sue Grossman Stillwater Greenway DOT Enhancement Construction $900,000 Completed $822,662
Summer
Burlington Burlington Trail to Farmington Trail DOT Enhancement Mastrobattisto $249,219 2010 $786
Schultz
Southington Linear Park DOT Enhancement Construction $1,902,990 Underway $356,265
Regional Summer
Redding Georgetown Village Streetscape MPO Enhancement M. Rondano $552,000 2010
Rt 5 over I-91 Bridge Rehabilitation,
Enfield Enfield DOT Highway/Bridge Arborio Corp. $6,657,600 Underway $3,976,313
Rt 15 Resurf., Safety;
Trumbull/Fairfield Trumbull/Fairfield DOT Highway/Bridge O&G Industries, Inc. $70,745,000 Underway $31,988,428
Milton C. Beebe &
Ashford Rt. 89 Superstructure Replacement. DOT Highway/Bridge Sons $1,272,600 Underway $622,767
Electrical
Various Distr. 2 Traffic Control Signals DOT Highway/Bridge Contractors, Inc. $2,201,050 Underway $894,359
Distr. 1 Traffic Control Signals and
Various Revisions DOT Highway/Bridge AM Rizzo $1,362,070 Underway $762,114
Replacement of Bridge Deck Joints
Various Dist IV DOT Highway/Bridge Mohawk $5,734,200 Completed $4,989,609
Replacement of Bridge Deck Joints on
Old Saybrook Baldwin Bridge DOT Highway/Bridge Blakeslee $2,851,300 Completed $2,305,444
Reconstruction of Bridge No. 00340
Branford (Amtrak R.R. over US 1) DOT Highway/Bridge JF White/Empire $70,815,491 Underway $6,670,585
Traffic Control signal installations and
Various revisions, District 3 DOT Highway/Bridge NYCONN Corp. $1,599,887 Underway $866,559
Loureiro
Westport Hales Road Bridge DOT Highway/Bridge Contractors Inc. $4,192,758 Underway $1,852,710
Replacement of Overhead Sign
Statewide Supports DOT Highway/Bridge ADF Industries $5,575,600 Underway $1,397,939
Various District 4 Traffic Control Signs DOT Highway/Bridge NYCONN Corp. $788,940 Underway $231,885
Rocky Hill/Wethersfield I-91 Pavement Preservation DOT Highway/Bridge Empire Paving $4,748,987 Completed $4,018,719
Seymour/Beacon Tilcon Connecticut,
Falls/Naugatuck Route 8 Pavement Preservation DOT Highway/Bridge Inc. $3,932,474 Completed $2,943,822
Colchester Route 2 Pavement Preservation DOT Highway/Bridge Empire Paving $3,802,792 Completed $3,188,965
Various Statewide Pavement Preservation DOT Highway/Bridge Costello Industries $2,204,907 Completed $1,791,498
Interstate Epoxy Pavement Markings -
District 1 Long Lines DOT Highway/Bridge Safety Marking $189,000 Completed $139,004
Interstate Epoxy Pavement Markings -
District 2 Long Lines DOT Highway/Bridge Safety Marking $189,000 Completed $124,430
Interstate Epoxy Pavement Markings -
District 3 Long Lines DOT Highway/Bridge Safety Marking $245,000 Completed $219,641
Interstate Epoxy Pavement Markings -
District 4 Long Lines DOT Highway/Bridge Safety Marking $77,000 Completed $47,305
Non-interstate Epoxy Pavement
District 1 Markings - Long Lines DOT Highway/Bridge Safety Marking $368,000 Completed $300,353
Non-interstate Epoxy Pavement
District 2 Markings - Long Lines DOT Highway/Bridge Safety Marking $464,000 Completed $390,362
Non-interstate Epoxy Pavement
District 3 Markings - Long Lines DOT Highway/Bridge Safety Marking $416,000 Underway
Non-interstate Epoxy Pavement
District 4 Markings - Long Lines DOT Highway/Bridge Safety Marking $352,000 Underway
Intersection Epoxy Pavement Highway Safety Summer
District 1 Markings DOT Highway/Bridge Systems $220,340 2010 $9,368
Intersection Epoxy Pavement
District 2 Markings DOT Highway/Bridge Safety Marking $213,420 Underway $7,972
Intersection Epoxy Pavement Summer
District 3 Markings DOT Highway/Bridge Safety Marking $567,740 2010 $5,577
Intersection Epoxy Pavement Highway Safety Summer
District 4 Markings DOT Highway/Bridge Systems $237,740 2010 $5,756