                                                                                                                                                                                                                                                                                                                                                              (As on 13.10.2021)
                                                                                                                                                                                    CENTRAL ELECTRICITY AUTHORITY
                                                                                                                                                                                         FUEL MANAGEMENT DIVISION
                                                                                                                                                                                          DAILY COAL STOCK REPORT
                                                                                                                                    COAL STOCK POSITION FOR COAL LINKAGE BASED THERMAL POWER STATIONS IN THE COUNTRY 
                                                                                                                                                                                                                                                                                                           Critical(*)/S
                                                                                                                                                                                                            Normative                                                                  Percentage (%)         uper 
                                                                                                                                             Capacity      PLF %             Normative  Requirement            stock                                                                    of Actual Stock  Critical(**)  Receipt of the 
                             Region/State                Mode of Transport                Name of Thermal Power Station         Sector         (MW)        (September,      Stock Reqd. for the day (In    Required(In                             Actual Stock                            Vis-à-vis          as per     day of report             Reasons for critical coal stock/Remarks
                                                                                                                                                           2021)               (Days)     '000 Tonnes')                                                                                                     number of       ('000 T)
                                                                                                                                                                                                          '000 Tonnes')                                                                   Normative  
                                                                                                                                                                                                                                                                                             Stock            days 
                                                                                                                                                                                                                                         In '000 Tonnes'                  In Days
                                                                                                                                                                                                                             Indigenous       Import        Total
                                   1                              2                                      3                         4             5                 6              7             8                 9               10            11            12             13                14               15            16                                      17
                          Northern
                          Haryana
                          1                    RAIL                                   INDIRA GANDHI STPP                          JV                 1500              54.1          30.0           16.6              498.6           19.3            0.0        19.3         1                4%               **            40        Plant regulated coal supply earlier.
                          2                    RAIL                                   MAHATMA GANDHI TPS                           P                 1320              71.3          25.0           13.5              338.0           40.1            0.0        40.1         3               12%               **            12        Less coal supply from CCL
                          3                    RAIL                                   PANIPAT TPS                                  S                   710             31.0          30.0             7.9             237.3            6.4            0.0         6.4         1                3%               **            13        Plant regulated coal supply earlier.  
                          4                    RAIL                                   RAJIV GANDHI TPS                             S                 1200              35.8          30.0            11.2             336.0            1.9            0.0         1.9         0                1%               **            12        Plant regulated coal supply earlier.  
                          5                    RAIL                                   YAMUNA NAGAR TPS                             S                   600             39.7          25.0             5.2             130.0            9.3            0.0         9.3         2                7%               **             8        Plant regulated coal supply earlier.  
                          Punjab
                          6                    RAIL-1500                              GH TPS (LEH.MOH.)                            S                   920             18.7          30.0           10.4              311.4           21.3            0.0        21.3         2                7%               **             4        Less coal supply from CCL
                          7                    RAIL-1500                              GOINDWAL SAHIB TPP                           P                   540             53.3          30.0             5.9             176.1            2.8            0.0         2.8         0                2%               **             4        Coal supply as per payment
                          8                    RAIL                                   RAJPURA TPP                                  P                 1400              69.4          25.0           18.1              453.5           42.5            0.0        42.5         2                9%               **            16        Less coal supply from SECL.
                          9                    RAIL                                   ROPAR TPS                                    S                   840             14.1          30.0             7.8             232.8           32.5            0.0        32.5         4               14%               *              4        Less coal supply from CCL
                          10                   RAIL-1500                              TALWANDI SABO TPP                            P                 1980              49.1          25.0           19.6              490.3           51.2            0.0        51.2         3               10%               **            12        Less coal supply from MCL.
                          Rajasthan
                          11                   RAIL                                   CHHABRA-I PH-1 TPP                           S                   500             34.2          25.0             4.3             107.3            0.0            0.0         0.0         0                0%               **             0        Plant to lift more coal through RCR mode
                          12                   RAIL                                   KAWAI TPS                                    P                 1320              63.6          25.0             9.8             244.3           52.0            0.0        52.0         5               21%               *             12        Less coal supply from SECL.
                          13                   RAIL                                   KOTA TPS                                     S                 1240              65.0          30.0           17.0              509.7           65.0            0.0        65.0         4               13%               *             16        Coal supply regulated earlier. Supply is being augmented by CIL
                          14                   RAIL-1500                              SURATGARH TPS                                S                 1500              19.8          30.0           13.2              396.3           16.8            0.0        16.8         1                4%               **             7        Coal supply regulated earlier. Supply is being augmented by CIL
                          Uttar Pradesh
                          15                   PITHEAD                                ANPARA C TPS                                 P                 1200              85.9          15.0           15.7              235.4           71.6            0.0        71.6         5               30%                             16
                          16                   PITHEAD                                ANPARA TPS                                   S                 2630              74.8          15.0           37.9              568.4           58.7            0.0        58.7         2               10%               **            35        Supplies are being augmented
                          17                   RAIL                                   BARKHERA TPS                                 P                    90             40.6          20.0             1.2              24.2            0.2            0.0         0.2         0                1%               **             0        Less supply from CCL
                          18                   RAIL                                   DADRI (NCTPP)                                C                 1820              42.8          30.0           20.3              610.2            0.0            0.0         0.0         0                0%               **            33        Plant regulated coal supply earlier. Less coal supply from CCL
                          19                   RAIL                                   HARDUAGANJ TPS                               S                   605             56.4          30.0             5.2             155.1            9.1            0.0         9.1         2                6%               **             4        Supplies are being augmented
                          20                   RAIL                                   KHAMBARKHERA TPS                             P                    90             37.0          20.0             0.8              15.4            0.3            0.0         0.3         0                2%               **             0        Coal supply as per payment
                          21                   RAIL                                   KUNDARKI TPS                                 P                    90             68.0          25.0             0.9              22.0            0.1            0.0         0.1         0                0%               **             0        Coal supply as per payment
                          22                   RAIL                                   LALITPUR TPS                                 P                 1980              72.1          25.0           15.5              388.0           87.4            0.0        87.4         6               23%               *             16        Less supply from CCL
                          23                   RAIL                                   MAQSOODPUR TPS                               P                    90             53.7          20.0             0.8              15.4            4.6            0.0         4.6         6               30%               *              3        Less supply from CCL
                          24                   RAIL                                   MEJA STPP                                   JV                 1320              79.8          20.0           14.3              286.0           17.5            0.0        17.5         1                6%               **            23        Less coal supply from CCL, NCL
                          25                   RAIL                                   OBRA TPS                                     S                 1094              47.2          20.0           10.7              213.8           31.4            0.0        31.4         3               15%               **             7        Supplies are being augmented
                          26                   RAIL                                   PARICHHA TPS                                 S                  1140             43.1          30.0           10.4              312.0            7.0            0.0         7.0         1                2%               **             4        Supplies are being augmented
                          27                   RAIL                                   PRAYAGRAJ TPP                                P                 1980              69.9          20.0           20.1              402.2           29.0            0.0        29.0         1                7%               **            12        Less coal supply from NCL
                          28                   PITHEAD                                RIHAND STPS                                  C                 3000              80.3          15.0           36.4              545.7          289.9            0.0       289.9         8               53%                             35
                          29                   RAIL                                   ROSA TPP Ph-I                                P                 1200              62.9          25.0             9.5             237.3           41.2            0.0        41.2         4               17%               *              8        Coal supply as per payment
                          30                   PITHEAD                                SINGRAULI STPS                               C                 2000              94.7          15.0           24.6              368.7          173.2            0.0       173.2         7               47%                             34
                          31                   RAIL                                   TANDA TPS                                    C                 1760              25.5          25.0           20.4              510.3            7.6            0.0         7.6         0                1%               **             8        Less coal supply from CCL
                          32                   RAIL                                   UNCHAHAR TPS                                 C                 1550              57.9          25.0           13.7              341.8           15.9            0.0        15.9         1                5%               **             7        Less coal supply from CCL
                          33                   RAIL                                   UTRAULA TPS                                  P                    90             57.1          20.0             1.0              19.2            2.1            0.0         2.1         2               11%               **             2        Coal supply as per payment
                          Total of Northern                                                                                                         39299                            23.7          419.7             9937.2        1207.5             0.0      1207.5         3               12%              30.0           406
                          Region
                          Western
                          Chhatisgarh
                          34                   RAIL                                   AKALTARA TPS                                 P                 1800              52.2          20.0           15.0              300.4           56.3            0.0        56.3         4               19%               *             21        Less coal supply from SECL.
                          35                   RAIL                                   BALCO TPS                                    P                   600             61.4          15.0             9.3             139.5           58.9            1.0        59.9         6               43%               *             21        Plant has coal linkage for part capacity
                          36                   ROAD                                   BANDAKHAR TPP                                P                   300             80.1          15.0             4.7              70.8           23.9            0.0        23.9         5               34%               *              3        Plant not able to lift coal through Road due to bad road condition
                          37                   RAIL                                   BARADARHA TPS                                P                 1200              49.7          20.0            11.4             227.4          105.2            0.0       105.2         9               46%                              4
                          38                   RAIL                                   BHILAI TPS                                  JV                   500             54.1          20.0             4.4              88.2           10.6            0.0        10.6         2               12%               **             0        Less coal supply from SECL.
                          39                   RAIL                                   BINJKOTE TPP                                 P                   600             37.4          15.0             6.2              92.3            3.1            0.0         3.1         1                3%               **             4        Plant did not maintain stock earlier. Now, less coal supply from 
                                                                                                                                                                                                                                                                                                                                        SECL.
                          40                   RAIL                                   DSPM TPS                                     S                   500             90.5          15.0             7.1             107.0           28.2            0.0        28.2         4               26%               *              8        Plant having Bridge Linkage.
                          41                   PITHEAD                                KORBA STPS                                   C                 2600              94.6          15.0           41.8              626.9           74.8            0.0        74.8         2               12%               **            41        Less supply from SECL
                          42                   PITHEAD                                KORBA-WEST TPS                               S                 1340              57.8          15.0           17.2              257.6           81.0            0.0        81.0         5               31%                             20
                          43                   RAIL                                   LARA TPP                                     C                 1600              59.5          15.0           19.2              288.3          102.4            0.0       102.4         5               36%               *             12        Plant having Bridge Linkage.
                          44                   RAIL                                   MARWA TPS                                    S                 1000              45.9          15.0             9.6             143.7           84.3            0.0        84.3         9               59%                              11
                          45                   ROAD                                   NAWAPARA TPP                                 P                   600               1.2         15.0             6.2              92.3           23.2            0.0        23.2         4               25%               *              0        Coal supply as per payment
                          46                   RAIL                                   PATHADI TPP                                  P                   600             60.2          15.0             6.7              99.9           58.6            0.0        58.6         9               59%                             18
                          47                   PITHEAD                                SIPAT STPS                                   C                 2980              67.1          15.0           32.8              491.9          335.6            0.0       335.6        10               68%                             37
                          48                   ROAD                                   TAMNAR TPP                                   P                 2400              32.3          20.0           24.5              489.2           21.0            0.0        21.0         1                4%               **            10        Plant not able to lift coal through Road due to bad road condition
                          49                   RAIL                                   UCHPINDA TPP                                 P                 1440              52.5          15.0           16.9              253.4           12.2            0.0        12.2         1                5%               **            14        Less coal supply from SECL.
                          Gujarat
                          50                   RAIL-1500                              GANDHI NAGAR TPS                             S                   630             47.8          30.0             8.5             254.7            7.3            0.0         7.3         1                3%               **             7        Less supply from SECL
                          51                   RAIL                                   SABARMATI (D-F STATIONS)                     P                   362             93.7          30.0             5.1             154.2           40.9          78.1        118.9        11               77%                              4
                          52                   RAIL                                   UKAI TPS                                     S                  1110             25.4          30.0             9.5             285.6          198.6            0.0       198.6        21               70%                              0
                          53                   RAIL-1500                              WANAKBORI TPS                                S                 2270              38.0          30.0           20.2              605.1          147.5            0.0       147.5         7               24%               *             32        Unloading constraints
                          Madhya Pradesh
                                                                                                                                                                                                                                                                                                           Critical(*)/S
                                                                                                                                                                                                            Normative                                                                  Percentage (%)         uper 
                                                                                                                                             Capacity      PLF %             Normative  Requirement            stock                                                                    of Actual Stock  Critical(**)  Receipt of the 
                             Region/State                Mode of Transport                Name of Thermal Power Station         Sector         (MW)        (September,      Stock Reqd. for the day (In    Required(In                             Actual Stock                            Vis-à-vis          as per     day of report             Reasons for critical coal stock/Remarks
                                                                                                                                                           2021)               (Days)     '000 Tonnes')                                                                                                     number of       ('000 T)
                                                                                                                                                                                                          '000 Tonnes')                                                                   Normative  
                                                                                                                                                                                                                                                                                             Stock            days 
                                                                                                                                                                                                                                         In '000 Tonnes'                  In Days
                                                                                                                                                                                                                             Indigenous       Import        Total
                          54                   PITHEAD                                AMARKANTAK EXT TPS                           S                   210             92.3          15.0             3.2              47.4           23.3            0.0        23.3         7               49%                              2
                          55                   RAIL                                   ANUPPUR TPP                                  P                 1200              69.2          20.0           19.1              382.8           50.0            0.0        50.0         3               13%               **            25        Less coal supply from SECL.
                          56                   RAIL                                   BINA TPS                                     P                   500             39.6          25.0             4.7             116.8           49.8            0.0        49.8        11               43%                              7
                          57                   RAIL                                   GADARWARA TPP                                C                 1600              75.4          20.0           21.2              424.8            8.9            0.0         8.9         0                2%               **            16        Plant did not maintain coal stock
                          58                   RAIL                                   KHARGONE STPP                                C                 1320                0.0         25.0            11.4             285.0            0.0            0.0         0.0         0                0%               **            12        Coal supply under flexibility
                          59                   RAIL                                   SANJAY GANDHI TPS                            S                 1340              38.0          20.0           12.4              248.6           72.9            0.0        72.9         6               29%               *              8        Plant to augment lifting of coal through road mode
                          60                   RAIL                                   SATPURA TPS                                  S                 1330              28.1          20.0           12.7              254.2           52.2            0.0        52.2         4               21%               *              4        Plant to augment lifting of coal through road mode
                          61                   RAIL                                   SEIONI TPP                                   P                   600             72.4          25.0             5.8             144.0           16.5            0.0        16.5         3               11%               **             0        Less supply from SECL
                          62                   RAIL                                   SHREE SINGAJI TPP                            S                 2520              38.7          25.0           23.5              586.3           80.5            0.0        80.5         3               14%               **            24        Plant to augment lifting of coal through road mode
                          63                   PITHEAD                                VINDHYACHAL STPS                             C                 4760              83.1          15.0           70.5             1058.0          292.8            0.0       292.8         4               28%               *             80        Less coal supply from NCL
                          Maharashtra
                          64                   RAIL                                   AMRAVATI TPS                                 P                 1350              67.1          25.0            11.2             279.3           45.1            0.0        45.1         4               16%               *             12        Less coal supply from SECL.
                          65                   RAIL                                   BHUSAWAL TPS                                 S                 1210              53.6          20.0           12.2              244.0           25.1            0.0        25.1         2               10%               **             8        Less coal supply from WCL,MCL,SECL,SCCL.
                          66                   RAIL                                   BUTIBORI TPP                                 P                   600               0.0         15.0             5.2              77.3           59.7            0.0        59.7        12               77%                              0
                          67                   RAIL                                   CHANDRAPUR(MAHARASHTRA)                      S                 2920              46.3          20.0           30.5              609.0           79.7            0.0        79.7         3               13%               **            23        Less coal supply from WCL,MCL,SECL,SCCL.
                                                                                      STPS
                          68                   RAIL                                   DAHANU TPS                                   P                   500             90.9          30.0             7.2             217.2            9.6            0.0         9.6         1                4%               **             4        Less coal supply from SECL.
                          69                   RAIL                                   DHARIWAL TPP                                 P                   600             80.8          20.0             6.7             134.2           28.2            0.0        28.2         4               21%               *              0        Less coal supply from SECL.
                          70                   RAIL                                   GMR WARORA TPS                               P                   600             39.8          20.0             8.2             164.6            1.0            0.0         1.0         0                1%               **             7        Coal supply as per payment
                          71                   RAIL                                   KHAPARKHEDA TPS                              S                 1340              51.8          25.0           20.0              499.3           24.7            0.0        24.7         1                5%               **            24        Less coal supply from WCL,MCL,SECL,SCCL.
                          72                   RAIL                                   KORADI TPS                                   S                 2190              42.1          25.0           23.6              588.8           19.9            0.0        19.9         1                3%               **            24        Less coal supply from WCL,MCL,SECL,SCCL.
                          73                   RAIL                                   MAUDA TPS                                    C                 2320              58.0          20.0           27.3              546.2           41.0          10.4         51.4         2                9%               **            44        Less coal supply from CIL
                          74                   RAIL                                   NASIK TPS                                    S                   630             26.3          25.0             6.8             168.8            9.7            0.0         9.7         1                6%               **             8        Less coal supply from WCL,MCL,SECL,SCCL.
                          75                   RAIL                                   PARAS TPS                                    S                   500             40.4          20.0             5.0              99.8            2.6            0.0         2.6         1                3%               **             0        Less coal supply from WCL,MCL,SECL,SCCL.
                          76                   RAIL                                   PARLI TPS                                    S                   750             43.2          25.0             7.7             191.8           25.8            0.0        25.8         3               13%               **             4        Less coal supply from WCL,MCL,SECL,SCCL.
                          77                   RAIL-1500                              SOLAPUR STPS                                 C                 1320              58.6          30.0            11.3             337.8            0.0            0.0         0.0         0                0%               **            12        Less coal supply from CIL
                          78                   RAIL                                   TIRORA TPS                                   P                 3300              61.8          20.0           39.4              788.6          229.5            0.0       229.5         6               29%               *             41        Less coal supply from SECL.
                          79                   ROAD                                   WARDHA WARORA TPP                            P                   540             41.8          15.0             4.5              67.2           35.7            0.0        35.7         8               53%                              4
                          Total of Western                                                                                                          60482                            20.3          687.2            13931.9        2757.7           89.5       2847.2         4               20%              35.0           660
                          Region
                          Southern
                          Andhra Pradesh
                          80                   RAIL-SEA                               DAMODARAM SANJEEVAIAH TPS                    S                 1600              29.3          25.0           13.6              340.0           65.4            0.0        65.4         5               19%               *             17        Supplies are being augmented
                          81                   RAIL                                   Dr. N.TATA RAO TPS                           S                 1760              67.5          25.0           23.8              595.3           20.9            0.0        20.9         1                4%               **            22        Supplies are being augmented
                          82                   RAIL-SEA                               PAINAMPURAM TPP                              P                 1320              76.9          25.0           19.3              483.3           31.1          27.1         58.2         2               12%               **            18        Coal Supply partially stopped due to regulation
                          83                   RAIL                                   RAYALASEEMA TPS                              S                 1650              41.1          20.0           16.8              335.4           75.7            0.0        75.7         5               23%               *             12        Supplies are being augmented
                          84                   RAIL                                   SIMHADRI                                     C                 2000              67.2          25.0           27.3              682.0           21.3            0.0        21.3         1                3%               **            35        Less coal supply from CIL
                          85                   RAIL                                   VIZAG TPP                                    P                 1040                0.0         25.0           10.5              261.3          152.3            0.0       152.3        15               58%                              0
                          Karnataka
                          86                   RAIL                                   BELLARY TPS                                  S                 1700              44.4          25.0           15.5              387.0           24.7            0.0        24.7         2                6%               **             8        Less coal supply from SCCL
                          87                   RAIL                                   KUDGI STPP                                   C                 2400              34.7          25.0           17.1              427.8           22.3            0.0        22.3         1                5%               **            15        Plant has bridge linkage
                          88                   RAIL                                   RAICHUR TPS                                  S                 1720              38.7          25.0           16.3              407.0           51.5            0.0        51.5         3               13%               **            20        Less coal supply from SCCL, WCL
                          89                   RAIL                                   YERMARUS TPP                                 S                 1600              43.1          25.0           13.7              343.3            5.2            0.0         5.2         0                2%               **             4        Less coal supply from SCCL
                          Tamil Nadu
                          90                   RAIL-SEA-1500                          METTUR TPS                                   S                   840             86.1          30.0           15.0              449.4           30.6            0.0        30.6         2                7%               **            15        Plant to evacuate coal stock lying at paradip port
                          91                   RAIL-SEA-1500                          METTUR TPS - II                              S                   600               4.1         30.0             8.4             252.9           44.3            0.0        44.3         5               18%               *              11       Plant to evacuate coal stock lying at paradip port
                          92                   RAIL-SEA                               NORTH CHENNAI TPS                            S                 1830              34.5          30.0           28.5              853.5          154.3            0.0       154.3         5               18%               *             32        Plant to evacuate coal stock lying at paradip port
                          93                   RAIL-SEA-1500                          TUTICORIN TPS                                S                 1050              62.5          30.0           18.0              539.7           54.4            0.0        54.4         3               10%               **            22        Plant to evacuate coal stock lying at paradip port
                          94                   RAIL-SEA                               VALLUR TPP                                  JV                 1500              61.1          30.0           14.8              444.3            0.0            0.0         0.0         0                0%               **             0        Coal Supply partially stopped due to regulation
                          Telangana
                          95                   RAIL                                   BHADRADRI TPP                                S                   810               0.0         15.0             9.4             140.6           39.6            0.0        39.6         4               28%               *             10        Plant regulated coal supply earlier
                          96                   PITHEAD                                KAKATIYA TPS                                 S                  1100             70.2          15.0           14.4              216.2          180.0            0.0       180.0        12               83%                              6
                          97                   RAIL                                   KOTHAGUDEM TPS (NEW)                         S                 1000              79.0          15.0           13.3              199.7           58.0            0.0        58.0         4               29%               *             18        Less supply from SCCL
                          98                   RAIL                                   KOTHAGUDEM TPS (STAGE-7)                     S                   800             77.7          15.0             9.4             140.3           68.5            0.0        68.5         7               49%                              11
                          99                   PITHEAD                                RAMAGUNDEM STPS                              C                 2600              81.2          15.0           36.5              547.1          107.1            0.0       107.1         3               20%               *             34        Less supply from SCCL
                          100                  RAIL                                   SINGARENI TPP                                S                 1200              91.1          15.0           17.6              264.2           92.7            0.0        92.7         5               35%               *             19        Plant has bridge linkage
                          Total of Southern                                                                                                         30120                            23.2          359.0             8328.9        1299.9           27.1       1327.0         4               16%              18.0           328
                          Region
                          Eastern
                                                                                                                                                                                                                                                                                                           Critical(*)/S
                                                                                                                                                                                                            Normative                                                                  Percentage (%)         uper 
                                                                                                                                             Capacity      PLF %             Normative  Requirement            stock                                                                    of Actual Stock  Critical(**)  Receipt of the 
                             Region/State                Mode of Transport                Name of Thermal Power Station         Sector         (MW)        (September,      Stock Reqd. for the day (In    Required(In                             Actual Stock                            Vis-à-vis          as per     day of report             Reasons for critical coal stock/Remarks
                                                                                                                                                           2021)               (Days)     '000 Tonnes')                                                                                                     number of       ('000 T)
                                                                                                                                                                                                          '000 Tonnes')                                                                   Normative  
                                                                                                                                                                                                                                                                                             Stock            days 
                                                                                                                                                                                                                                         In '000 Tonnes'                  In Days
                                                                                                                                                                                                                             Indigenous       Import        Total
                          Bihar
                          101                  RAIL                                   BARAUNI TPS                                  C                   710             30.3          20.0             6.1             121.8           11.6            0.0        11.6         2               10%               **             4        Plant did not maintained coal stock
                          102                  RAIL                                   BARH II                                      C                 1320              62.4          20.0            11.3             225.4            3.5            0.0         3.5         0                2%               **             4        Plant has bridge linkage
                          103                  PITHEAD                                KAHALGAON TPS                                C                 2340              66.7          15.0           25.1              376.7           23.4            0.0        23.4         1                6%               **            21        Less coal supply from ECL
                          104                  RAIL                                   MUZAFFARPUR TPS                             JV                   610             33.3          20.0             5.8             115.2           11.9            0.0        11.9         2               10%               **             0        Less coal supply from CCL
                          105                  RAIL                                   NABINAGAR STPP                              JV                 1320              74.0          20.0           15.4              308.4           25.3            0.0        25.3         2                8%               **            19        Less coal supply from CCL
                          106                  RAIL                                   NABINAGAR TPP                               JV                   750             52.8          20.0             8.9             177.0           13.4            0.0        13.4         2                8%               **            12        Less coal supply from CCL
                          Jharkhand
                          107                  RAIL                                   BOKARO TPS `A` EXP                           C                   500             72.3          20.0             5.0              99.0            0.7            0.0         0.7         0                1%               **             4        Less coal supply from CCL,ECL and BCCL
                          108                  RAIL                                   CHANDRAPURA(DVC) TPS                         C                   500             81.8          20.0             6.0             120.6            8.1            0.0         8.1         1                7%               **             7        Less coal supply from CCL,ECL and BCCL
                          109                  RAIL                                   JOJOBERA TPS                                 P                   240             77.3          20.0             3.7              73.2           10.5            0.0        10.5         3               14%               **             4        Less coal supply from CCL
                          110                  RAIL                                   KODARMA TPP                                  C                 1000              74.8          20.0           10.3              205.4           24.7            0.0        24.7         2               12%               **            10        Less coal supply from CCL,ECL and BCCL
                          111                  RAIL                                   MAHADEV PRASAD STPP                          P                   540             49.1          20.0             8.2             164.6            7.5            0.0         7.5         1                5%               **             6        Coal supply as per payment.
                          112                  RAIL                                   MAITHON RB TPP                              JV                 1050              87.6          20.0           12.1              241.2          122.9            0.0       122.9        10               51%                              8
                          113                  RAIL                                   TENUGHAT TPS                                 S                   420             35.8          20.0             3.9              78.8            5.3            0.0         5.3         1                7%               **             3        Supplies are being augmented
                          Odisha
                          114                  PITHEAD                                DARLIPALI STPS                               C                 1600              90.5          15.0           19.4              290.7           88.4            0.0        88.4         5               30%                             23
                          115                  ROAD                                   DERANG TPP                                   P                 1200              83.6          20.0           13.0              259.8          441.7            0.0       441.7        34              170%                              0
                          116                  PITHEAD                                IB VALLEY TPS                                S                 1740              70.6          15.0           22.5              337.1           77.1            0.0        77.1         3               23%               *             21        Less supply from MCL. Plant to augment coal through its captive 
                                                                                                                                                                                                                                                                                                                                        mine
                          117                  RAIL                                   KAMALANGA TPS                                P                 1050              87.4          15.0           14.9              222.9           56.9            0.0        56.9         4               26%               *             17        Coal supply as per payment
                          118                  RAIL                                   STERLITE TPP                                 P                   600             50.9          15.0             6.6              99.5           32.9            0.0        32.9         5               33%               *              3        Less coal supply from MCL
                          119                  PITHEAD                                TALCHER STPS                                 C                 3000              86.3          15.0           44.2              663.2          497.2            0.0       497.2        11               75%                             48
                          West Bengal
                          120                  RAIL                                   BAKRESWAR TPS                                S                 1050              78.2          20.0           15.5              310.0          112.3            0.0       112.3         7               36%                             17
                          121                  RAIL                                   BANDEL TPS                                   S                   330             60.5          20.0             5.1             102.8           24.5            0.0        24.5         5               24%               *              4        Plant to augment coal supplies from its captive mines
                          122                  RAIL                                   BUDGE BUDGE TPS                              P                   750             91.8          20.0           10.3              205.2           64.9            0.0        64.9         6               32%               *             22        Less coal supply from ECL,MCL. Plant to take more coal from 
                                                                                                                                                                                                                                                                                                                                        captive coal mine.
                          123                  RAIL                                   D.P.L. TPS                                   S                   550             42.6          20.0             7.1             142.0            9.8            0.0         9.8         1                7%               **             7        Plant to augment coal supplies from its captive mines
                          124                  RAIL                                   DURGAPUR STEEL TPS                           C                 1000              70.6          25.0             8.4             209.3           25.2            0.0        25.2         3               12%               **             0        Less coal supply from CCL,ECL and BCCL
                          125                  RAIL                                   DURGAPUR TPS                                 C                   210               0.0         20.0             2.3              46.2           63.3            0.0        63.3        27              137%                              0
                          126                  PITHEAD                                FARAKKA STPS                                 C                 2100              53.0          15.0           19.4              290.3           24.2            0.0        24.2         1                8%               **            18        Less coal supply from ECL
                          127                  RAIL                                   HALDIA TPP                                   P                   600             91.1          20.0             9.7             194.6           40.2            0.0        40.2         4               21%               *              7        Less coal supply from MCL
                          128                  RAIL                                   HIRANMAYE TPP                                P                   300             23.8          25.0             3.3              81.3            7.1            0.0         7.1         2                9%               **             5        New Plant/Less coal supply from MCL
                          129                  RAIL                                   KOLAGHAT TPS                                 S                 1260              42.7          20.0           14.8              295.8           17.0            0.0        17.0         1                6%               **            14        Plant to augment coal supplies from its captive mines
                          130                  RAIL                                   MEJIA TPS                                    C                 2340              66.3          20.0           24.2              483.0           12.7            0.0        12.7         1                3%               **            28        Plant having Bridge Linkage.
                          131                  RAIL                                   RAGHUNATHPUR TPP                             C                 1200              62.4          15.0           13.4              201.3            0.0            0.0         0.0         0                0%               **            13        Less coal supply from CCL,ECL and BCCL
                          132                  RAIL                                   SAGARDIGHI TPS                               S                 1600              61.0          20.0           20.1              402.8          102.2            0.0       102.2         5               25%               *             20        Plant to augment coal from its Captive Sources
                          133                  RAIL                                   SANTALDIH TPS                                S                   500             92.6          20.0             8.2             164.6           47.6            0.0        47.6         6               29%               *             14        Plant to augment coal supplies from its captive mines
                          134                  RAIL                                   SOUTHERN REPL. TPS                           P                   135             27.4          20.0             2.2              43.2           11.1            0.0        11.1         5               26%               *              4        Less coal supply from ECL,MCL. Plant to take more coal from 
                                                                                                                                                                                                                                                                                                                                        captive coal mine.
                          Total of Eastern                                                                                                          34415                            18.2          406.1             7394.2        2025.1             0.0      2025.1         5               27%              28.0           388
                          Region
                          North Eastern
                          Assam
                          135                  RAIL                                   BONGAIGAON TPP                               C                   750             67.3          25.0             6.9             173.5           13.2            0.0        13.2         2                8%               **             7        Less coal supply from ECL
                          Total of North                                                                                                            750.00                           25.0             6.9             173.5           13.2            0.0        13.2         2                8%              1.0             7
                          Eastern Region
                          Region-wise/All                                                                                                          165066                            21.2         1878.9            39849.5        7303.4          116.6       7420.0         4               19%             112.0          1789
                          India total
                          No. of plants with Critical /Super CriticalStock
                                                                                                                                                                                                                                                         Total Stock Total Stock (in 
                                                                                                                                                                                                                                                         ('000 T)     Days)                               Stock in 
                          Pithead Plants                                                      As per Number of days                                                                           Mode       No. of Plants      Capacity      Daily Req                                                       Days            Number of                             Capacity (MW)
                                                                                                                                                                                                                            (MW)          ('000 T)                                                        (Critical/Su      Plants
                                                                                                                                                                                                                                                                                                          per Critical)
                          (*) No. of plants with Critical Stock (<5 Days)                                3                                                                               Pithead                 16             35200          461.4        2398.2            5                           0 day               17                                     17050
                          (**) No. of plants with Super Critical Stock (<3 Days)                         4                                                                               Non-Pithead            119            129866         1417.5        5021.7            4                           1 day               27                                     36140
                          Non-Pithead                                                                                                                                                    TOTAL                  135            165066         1878.9        7420.0            4                           2 days              20                                     22175
                          (*) No. of plants with Critical Stock (<7 Days)                                31                                                                                                                                                                                               3 days              14                                     20734
                          (**) No. of plants with Super Critical Stock (<4 Days)                         64                                                                                                                                                                                               4 days              14                                     17680
                          Non-Pithead (More than 1500 kms)                                                                                                                                                                                                                                                5 days              12                                     12765
                          (*) No. of plants with Critical Stock (<9 Days)                                2                                                                                                                                                                                                6 days               7                                     8560
                          (**) No. of plants with Super Critical Stock (<5 Days)                         8                                                                                                                                                                                                7 days               1                                     2270
                          Total                                                                         112                                                                                                                                                                                               8 days               0                                       0
                          NOTE:                                                                                                                                                                                                                                                                           TOTAL               112                                   137374
                          (i) Daily coal requirement is based on the maximum of the requirement for average actual consumption  of the plant for last 7 days or requirement for installed capacity of plant at 55%PLF.
                          (ii)  Stock resticted to 70% Domestic and 30% Imported ratio.
                          (iii) Power plants located at a distance of about 1500 km from linked coal mines taking coal through Rail mode (RAIL-1500) and Rail-Sea (RAIL-SEA-1500).
                          C:Central Sector; S: State Sector; P: Private Sector; JV: Joint Venture
The words contained in this file might help you see if this file matches what you are looking for:

...As on central electricity authority fuel management division daily coal stock report position for linkage based thermal power stations in the country critical s normative percentage uper capacity plf requirement of actual receipt regionstate mode transport name station sector mw september reqd day required visavis per reasons stockremarks days tonnes number t indigenous import total northern haryana rail indira gandhi stpp jv plant regulated supply earlier mahatma tps p less from ccl panipat rajiv yamuna nagar punjab gh lehmoh goindwal sahib tpp payment rajpura secl ropar talwandi sabo mcl rajasthan chhabrai ph to lift more through rcr kawai kota is being augmented by cil suratgarh uttar pradesh pithead anpara c...

no reviews yet
Please Login to review.