CFS WORK PACKAGES
CFS WORK PACKAGES
EDR - CFS Europe – Kick-Off Meetings
EDR - CFS Europe – Kick-Off Meetings
SUMMARY
SUMMARY
1. Extracts from Chapter 7 of RDR
1. Extracts from Chapter 7 of RDR
2. Scope of CFS Work Packages
2. Scope of CFS Work Packages
3. ILC Technical Time Schedule for CFS Design and start of Works
3. ILC Technical Time Schedule for CFS Design and start of Works
4. Functional WBS and WP descriptions, EDR Phase 1
4. Functional WBS and WP descriptions, EDR Phase 1
5. Functional WBS and WP descriptions, EDR Phase 2
5. Functional WBS and WP descriptions, EDR Phase 2
6. Deadlines and Distribution of WP, EDR Phase 1
6. Deadlines and Distribution of WP, EDR Phase 1
7. Deadlines and Distribution of WP, EDR Phase 2
7. Deadlines and Distribution of WP, EDR Phase 2
8. Conclusions
8. Conclusions
Kick-Off Meetings, CERN, 3, 4, 5 September 2007 2
Kick-Off Meetings, CERN, 3, 4, 5 September 2007
CFS WORK PACKAGES
CFS WORK PACKAGES
EDR - CFS Europe – Kick-Off Meetings
EDR - CFS Europe – Kick-Off Meetings
1 Extract from Chapter 7 of the RDR
Extract from Chapter 7 of the RDR
1
”the Engineering Design Phase”
”the Engineering Design Phase”
•
The Technical Work of the EDR Phase to be organized in
The Technical Work of the EDR Phase to be organized in
Work Packages
Work Packages
•
Each Level 3 System Manager to manage a Collection of WP
Each Level 3 System Manager to manage a Collection of WP
representing the WBS
representing the WBS
•
WP should have well defined Scope (suitable for distribution)
WP should have well defined Scope (suitable for distribution)
•
PM and Level 3 Managers are primarily responsible for
PM and Level 3 Managers are primarily responsible for
identifying Key Milestones and Deliverables
identifying Key Milestones and Deliverables
•
Level 3 System manager 1 : Civil Engineering : J-L Baldy then
Level 3 System manager 1 : Civil Engineering : J-L Baldy then
J. Osborne (CERN)
J. Osborne (CERN)
Kick-Off Meetings, CERN, 3, 4, 5 September 2007 3
Kick-Off Meetings, CERN, 3, 4, 5 September 2007
CFS WORK PACKAGES
CFS WORK PACKAGES
EDR - CFS Europe – Kick-Off Meetings
EDR - CFS Europe – Kick-Off Meetings
2 Scope of CFS Work Packages
Scope of CFS Work Packages
2
•
Collect of frozen data from Area, Technical and global Systems
Collect of frozen data from Area, Technical and global Systems
(after iterating process)
(after iterating process)
•
Evaluate and supply the necessary resources
Evaluate and supply the necessary resources
•
Set up the Methodology for Design and Work Phases
Set up the Methodology for Design and Work Phases
(Splitting and ordering of tasks, Selection and
(Splitting and ordering of tasks, Selection and
Contracting of Consultants, Architects, Experts, …)
Contracting of Consultants, Architects, Experts, …)
•
Set up of detailed Time Schedule for all Phases
Set up of detailed Time Schedule for all Phases
Set up of Cost Estimates at ±10% (with a “before/after T “
• Set up of Cost Estimates at ±10% (with a “before/after T “
0
0
splitting)
splitting)
•
Produce all Design Documents (with Contribution from
Produce all Design Documents (with Contribution from
External Consultants)
External Consultants)
•
Full writing of EDR CFS Design Chapters
Full writing of EDR CFS Design Chapters
Kick-Off Meetings, CERN, 3, 4, 5 September 2007 4
Kick-Off Meetings, CERN, 3, 4, 5 September 2007
CFS WORK PACKAGES
CFS WORK PACKAGES
EDR - CFS Europe – Kick-Off Meetings
EDR - CFS Europe – Kick-Off Meetings
3 ILC Technical Time Schedule for CFS Design and Start
ILC Technical Time Schedule for CFS Design and Start
3
of Works
of Works
Kick-Off Meetings, CERN, 3, 4, 5 September 2007 5
Kick-Off Meetings, CERN, 3, 4, 5 September 2007
CFS WORK PACKAGES
CFS WORK PACKAGES
EDR - CFS Europe – Kick-Off Meetings
EDR - CFS Europe – Kick-Off Meetings
4 Functional WBS and WP Descriptions, EDR Phase 1
Functional WBS and WP Descriptions, EDR Phase 1
4
1/2
1/2
Kick-Off Meetings, CERN, 3, 4, 5 September 2007 6
Kick-Off Meetings, CERN, 3, 4, 5 September 2007