287x Filetype PPTX File size 0.18 MB Source: debbyzalinablog.files.wordpress.com
Tujuan Pembelajaran
• Mahasiswa mampu memvalidasi MPS
• Mahasiswa mampu memahami perencanaan kapasitas
• Mahasiswa mampu memahami peran pekerja terhadap perhitungan
RCCP
Referensi
Wiratno, S. E., Lecture PPT: Capacity Planning, IE-ITS, 2009.
Ilhami, Muhammad Adha, Lecture PPT: Rough Cut Capacity
Planning, FT Untirta, 2014
• Smith, Spencer B., Computer-Based Production and Inventory
Control, Prentice-Hall, 1989.
RCCP
• Rough-cut capacity planning is the key function for driving medium-
term capital planning. Here the basic idea is to predict when
additional capacity will be required in advance of that need becoming
crisis, and then use the basic numbers and the process that predicted
that need to justify capital expenditures.
• Capital Planning is something every company does: rough-cut
capacity planning ensure that the way the company wants to operate
and the capital plan that guarantees that it is possible are consistent
with each other.
Perspective RCCP
• Tujuan RCCP adalah untuk mengkonversikan rencana level atas (high
level plan) ke dalam kebutuhan sumber daya yang dibutuhkan
(misalnya jumlah mesin) untuk melaksanakan rencana tersebut.
• Mengkoversi penjualan dan rencana operasi ke dalam kebutuhan
kapasitas (“kira-kira”) untuk 12 – 18 bulan ke depan.
Alasan Perlunya RCCP
• Untuk menggambarkan view/gambaran kedepan untuk kebutuhan
kapasitas, sehingga rencana tersebut dapat divalidasi.
• Untuk mengatur perubahan sebagai akibat dari perubahan pasar dan
kondisi manufaktur, serta juga akibat performansi aktual yang mungkin
berubah dari rencana.
• Untuk mengkoneksikan cara perusahaan untuk beroperasi dengan
sumber daya yang ada.
no reviews yet
Please Login to review.