Water Pollution Prevention
This pamphlet is for contractors and INFORMATION
others who work on Caltrans construction SOURCES
sites. Its goal is to educate and encourage OPERATIONAL FACT SHEETS
us to prevent water pollution. Water Bridge construction Operations
pollution prevention is a good thing to do PCC and AC
and it’s part of your contract. Clearing and Grubbing
Highway Planting and Landscaping
Mobilization Water Pollution
Piling
Roadway Construction Prevention
Trenching Fact Sheet
Vehicle and Equipment Fueling
STORM WATER QUALITY HANDBOOKS
Construction Site Best Management
Practices (BMPs) Manual
SWPPP and WPCP Preparation Manual Bridge
For individuals with sensory disabilities, this OTHER MANUALS Construction
document is available in Braille, large print, Guidance for Temporary Soil Stabilization
on audiocassette or computer disk. To obtain BMP Field Manual and Troubleshooting Operations
a copy in one of these alternate formats, Guide
please write or call:
Office of Training and Environmental DIVISION OF
Compliance CONSTRUCTION
DIVISION OF CONSTRUCTION, MS 44 CONSTRUCTION
P.O. Box 942874 CALIFORNIA DEPARTMENT OF TRANSPORTATION
Sacramento, CA 94274
Voice (916) 654-2467 For more information please visit our website: Keep our Waterways CLEAN
California Relay Service 1-800-735-2929 Keep our Waterways CLEAN
https://dot.ca.gov/programs/construction/storm-water-and-water-pollution-control
D ISTURBED S OIL / S TOCKPILES
DISTURBED SOIL / STOCKPILES C ONCRETE C URING
CONCRETE CURING
Do not let storm water runoff carry soil and If you are using a curing compound, make sure
other pollutants into storm drains or watercourses
the cure is applied at proper rates and as close
(streams, rivers, lakes, etc.).
as possible to concrete surface. Try to avoid
Use approved silt fence, sediment fiber rolls,
over sprays.
control gravel BMPs to bags, and prevent other Protect drain inlets prior to the application of
soil and trash from getting into storm drain curing compound.
systems or watercourses. Examine cure containers and spraying equipment
At a minimum, all bare soil (whether it’s an for leaks. Clean up spills or leaks immediately.
abutment slope or a stockpile) must be protected Curing compound containers must be properly
before it rains. labeled and are required to have a second
Use soil stabilization BMPs such as mulch, soil containment for storage.
binders, plastic sheeting or erosion If water curing is used, make sure the curing
control blankets to protect bare soil. water is directed away from and not discharged
B RIDGE C ONSTRUCTI ON
RIDGE ONSTRUCTION
B C into watercourses (streams, rivers, lakes, etc) and
O PERATIONS
OPERATIONS drainage inlets.
A RE Y OU D EWATERING?
ARE YOU DEWATERING?
Bridge construction operations on Caltrans KEEP THE JOBSITE ORDERLY
EEP THE OBSITE RDERLY
K J O
If you need to remove water from an excavation,
construction sites include activities such as
drilled holes, or coring operation, first check Don’t store hazardous chemicals, drums, bagged
bridge demolition, structural excavation and
and boxed materials directly on the ground.
with your foreman or resident engineer. You
backfill, erecting falsework, forming and
may need a permit. Store hazardous material such as curing
pouring concrete for footings columns and compound, solvents, paints, chemicals, hydraulic
You must use approved BMPs to treat the
superstructures, boring, drilling, grinding, fluids, form oil, fuel, oil, and grease in secondary
discharge. You may also need to sample
mortar mixing, blasting, and bridge cleaning. the discharge for pollutants. containment.
Place bagged or boxed materials on pallets and
under cover before the start of rain.
We can help minimize the impact of bridge
C ONCRETE W ASHOUTS
CONCRETE WASHOUTS
Place temporary septic facilities away from drain
construction activities by identifying and
inlets, watercourses and traffic circulation.
containing potential pollutants before they
Wash out concrete trucks or pumps only into
If you are working over water, make sure the
come in contact with storm water.
designated washout pits.
construction equipment is leak free. Use
If you don’t see a washout pit or are not sure
covers or platforms to collect debris. Do not
The following procedures and practices are
where to washout, ask your foreman or
allow demolished particles to enter waterways.
intended to help minimize or eliminate the resident engineer.
Provide an adequate number of waste containers
impact of bridge construction operations on Be sure to clean out the washout pit or build a
to collect construction waste, trash and debris
new one once the washout is 75 % full.
the quality of our waters.
from the site.
Make sure concrete waste does not enter storm
If you are not sure what to do, ask your
drains or watercourses (stream, rivers, lakes, etc.)
foreman!