Authentication
361x Tipe DOCX Ukuran file 2.14 MB Source: www.djppr.kemenkeu.go.id
ENVIRONMENTAL AND SOCIAL MANAGEMENT
FRAMEWORK (ESMF) FOR THE INDONESIA
INFRASTRUCTURE FINANCE DEVELOPMENT
TRUST FUND (IIFD-TF)
Prepared for:
THE MINISTRY OF FINANCE
DIRECTORATE OF GOVERNMENT SUPPORT AND INFRASTRUCTURE FINANCING MANAGEMENT
ST
FRANS SEDA BUILDING 1 FLOOR
JLN DR. WAHIDIN RAYA NO.1
JAKARTA 10710
INDONESIA
JANUARY 2016
WB7750
DRAFT
TABLE OF CONTENTS
TABLE OF CONTENTS...............................................................i
LIST OF TABLES......................................................................v
LIST OF FIGURES....................................................................v
LIST OF APPENDICES..............................................................v
LIST OF ACRONYMS..............................................................vii
EXECUTIVE SUMMARY............................................................ix
DEFINITION OF TERMS...........................................................xi
1.0 INTRODUCTION...............................................................1
1.1 THE PURPOSE OF THE PPP CENTRE..............................................................1
2.0 THE PROJECT AND THE ESMF...........................................2
2.1 THE SUPPORTING PROJECT............................................................................5
2.2 NATURE OF THE PROJECT INTERVENTIONS.................................................6
2.3 WORLD BANK SAFEGUARDS...........................................................................6
2.3.1 Environmental Assessment (OP/BP 4.01)..............................................7
2.3.2 Natural Habitats (OP/BP 4.04)...............................................................8
2.3.3 Forests (OP/BP 4.36).............................................................................9
2.3.4 Pest Management (OP 4.09)................................................................10
2.3.5 Physical Cultural Resources (OP/BP 4.10)..........................................10
2.3.6 Indigenous Peoples (OP/BP 4.10)........................................................12
2.3.7 Involuntary Resettlement (OP/BP 4.12)................................................14
2.3.8 Safety of Dams (OP 4.37)....................................................................17
2.4 STATE OF PROJECTS......................................................................................20
2.5 RESULT OF THIS ESMF PROCESS.................................................................20
3.0 PROJECT SCREENING.....................................................21
3.1 ENVIRONMENT AND SOCIAL SCREENING....................................................21
3.2 PROJECT CATEGORY......................................................................................22
3.3 GOVERNMENT CONTRACTING AGENCY.......................................................25
3.4 PPP CENTRE.....................................................................................................26
3.5 THE LAND ACQUISITION LAW........................................................................26
3.6 ENVIRONMENTAL HEALTH AND SAFETY......................................................29
3.7 PERFORMANCE INDICATORS.........................................................................29
3.8 NEXT STAGES FOR THE PPP PROJECT........................................................30
4.0 FEASIBILITY STUDY TOR – ENVIRONMENTAL AND SOCIAL
ASPECTS.......................................................................30
4.1 GOVERNMENT LEGISLATIONS AND WORLD BANK SAFEGUARDS...........30
4.2 GENERIC SCOPE OF WORK............................................................................32
ESMF TOR i
4.3 METHODOLOGY...............................................................................................33
4.4 EXPECTED OUTPUTS......................................................................................33
4.5 EXPERTS...........................................................................................................34
4.6 TIMELINE...........................................................................................................34
5.0 TRAINING AND CAPACITY BUILDING...............................34
5.1 ASSESSMENT OF INSTITUTIONAL SYSTEMS...............................................37
5.2 MINIMUM REQUIREMENTS FOR EFFECTIVE IMPLEMENTATION................37
5.3 TRAINING NEEDS.............................................................................................38
5.4 COST NORMS AND STANDARDS....................................................................38
ESMF TOR ii
no reviews yet
Please Login to review.