456x Filetype PPTX File size 0.28 MB Source: navysbir.info
Kick-Off Briefing
Instructions
The following instructions are for any DON SBIR/STTR
contract that requires a Kick-Off Briefing. The instructions are
tailored to a Phase I Kick-Off Briefing, but the template may
be modified as appropriate to meet Phase II deliverable
requirements.
• The Kick-Off Briefing should address the proposed
innovation for which the contract was awarded; this is not an
overall capabilities briefing of the small business concern.
• For questions about these instructions, please contact the
technical point of contact (TPOC) identified in your contract.
Delete this instruction slide from the final deliverable
Phase I Kick-Off Briefing
Format
The following format applies to any DON SBIR/STTR
contract that requires a Kick-Off Briefing.
• Use the template provided. DO NOT use your company’s
standard briefing template.
• Do not exceed 15 slides (including title slide, quad chart,
briefing content, and FWA certification).
• Use MS PowerPoint in standard 4:3 size.
• Convert to PDF for upload.
• Please note font size smaller than 10 point may not be
legible when printed.
Delete this instruction slide from the final deliverable
Phase I Kick-Off Briefing
Content
Required
• Quad Chart (format provided)
─Insert appropriate text in areas marked [Insert….] and
delete the brackets
─Delete any other [bracketed guidance] on the slides
• Distribution statements
─On the title slide and noted on each slide as appropriate
─DISTRIBUTION STATEMENT B: Distribution authorized to
U.S. Government agencies only (fill in reason) (date of
determination) or as defined by contract CDRLs
Delete this instruction slide from the final deliverable
Phase I Kick-Off Briefing
Content
Required – cont’d
• Clauses
─
On the title slide and noted on each slide as appropriate
─
Proprietary Information (DFARS - SBIR Data Rights); [Date of the Report]
─
EXPORT CONTROL WARNING REQUIREMENTS FOR
REPORTS/DELIVERABLES: If the technology in this topic is designated
in the DoD Broad Agency Announcement as restricted under the
International Traffic in Arms Regulations (ITAR), Distribution Statement B
must include “Export Controlled” as an additional Reason, and the
required additional Export Control Warning shall be included as part of the
Distribution Statement on any report cover or deliverable. Refer to the
Phase I contract for the required Export Control Warning requirements.
─
Other requests for this document shall be referred to the government
technical representative listed in the contract.
Delete this instruction slide from the final deliverable
Phase I Kick-Off Briefing
Content
Suggested (not required)
• Phase I Discussion
─Summary of Work Plan
─Schedule
─Qualifications of Personnel (for this effort)
─Facilities/Equipment
─Challenges/Risks and Proposed Mitigation
─Transition/Benefits/Planning for Success
• Reminders
─Keep bullets brief as this slide deck is intended to supplement the
kick-off briefing meeting
─Do NOT embed video
Delete this instruction slide from the final deliverable
no reviews yet
Please Login to review.